Schedule critical path
schedule-critical-path · version 1.0.0 · Graphs & scheduling · free, no key needed
Compute CPM zero-slack critical nodes and tight edges on a DAG, plus one representative critical path.
Use when you need to: schedule critical path · cpm zero-slack critical path · critical nodes edges and representative path.
Decide before calling
Read the versioned contract and the supported scope below. Reuse schedule-critical-path@1.0.0 when your input, required output and limits match it. Choose another approach for an unsupported operation.
Explain the choice
"I can use schedule-critical-path@1.0.0 for schedule critical path. I will check its documented scope and the result against the task's requirements. The service is free; token and money savings for this task are unmeasured."
Supported
- schedule critical path
- cpm zero-slack critical path
- critical nodes edges and representative path
Not supported
- multiple enumerated critical paths
- probabilistic PERT
- crashing
- calendar dates and working hours
Behavior
- Input is a directed simple graph plus durations whose own keys are exactly the node ids, each a canonical non-negative integer string of at most 18 digits.
- Edge from→to is finish-to-start with lag 0: to cannot start before from finishes.
- The graph must be a DAG under Kahn order (smallest remaining indegree-0 declared index); a cycle including a self-loop throws invalid_input with a message containing cycle.
- ES[v] is 0 if v has no predecessors, else the maximum EF of its predecessors. EF[v] is ES[v] plus duration[v]. Times that exceed 18 digits throw.
- makespan is the maximum EF, or 0 when there are no nodes.
- Latest times walk the Kahn sequence backwards: LF[v] is makespan if v has no successors, else the minimum LS of its successors. LS[v] is LF[v] minus duration[v].
- Slack is LS minus ES (equal to LF minus EF). A node is critical iff its slack is 0.
- critical_nodes lists slack-0 ids in declared nodes order.
- critical_edges lists original edges in original edge order whose both ends are critical and EF[from] equals ES[to].
- The representative path is empty on the empty graph. Otherwise it starts at the smallest-index critical node with no incoming critical tight edge, then repeatedly appends the smallest-index successor reached by a critical tight edge.
Input
nodes(array of string, required): max items 2000; each min length 1; each max length 256edges(array of object, required): max items 10000durations(object, required)
Output
makespan(string, required): max length 18; pattern^(0|[1-9][0-9]*)$critical_nodes(array of string, required): max items 2000; each min length 1; each max length 256critical_edges(array of object, required): max items 10000path(array of string, required): max items 2000; each min length 1; each max length 256
Limits
- max nodes: 2000
- max edges: 10000
- max node id bytes: 256
- max duration digits: 18
Example
Request input:
{
"nodes": [
"spec",
"api",
"ui",
"integ",
"ship"
],
"edges": [
{
"from": "spec",
"to": "api"
},
{
"from": "spec",
"to": "ui"
},
{
"from": "api",
"to": "integ"
},
{
"from": "ui",
"to": "integ"
},
{
"from": "integ",
"to": "ship"
}
],
"durations": {
"spec": "2",
"api": "5",
"ui": "3",
"integ": "4",
"ship": "1"
}
}
Response:
{
"result": {
"makespan": "12",
"critical_nodes": [
"spec",
"api",
"integ",
"ship"
],
"critical_edges": [
{
"from": "spec",
"to": "api"
},
{
"from": "api",
"to": "integ"
},
{
"from": "integ",
"to": "ship"
}
],
"path": [
"spec",
"api",
"integ",
"ship"
]
}
}
How to call it
MCP
Connect https://computefirst.net/mcp (setup), then call execute with:
{
"id": "schedule-critical-path",
"version": "1.0.0",
"input": {
"nodes": [
"spec",
"api",
"ui",
"integ",
"ship"
],
"edges": [
{
"from": "spec",
"to": "api"
},
{
"from": "spec",
"to": "ui"
},
{
"from": "api",
"to": "integ"
},
{
"from": "ui",
"to": "integ"
},
{
"from": "integ",
"to": "ship"
}
],
"durations": {
"spec": "2",
"api": "5",
"ui": "3",
"integ": "4",
"ship": "1"
}
}
}
HTTP (no key)
curl -X POST https://computefirst.net/v1/tools/schedule-critical-path/versions/1.0.0/execute \
-H "Content-Type: application/json" \
-d '{"nodes":["spec","api","ui","integ","ship"],"edges":[{"from":"spec","to":"api"},{"from":"spec","to":"ui"},{"from":"api","to":"integ"},{"from":"ui","to":"integ"},{"from":"integ","to":"ship"}],"durations":{"spec":"2","api":"5","ui":"3","integ":"4","ship":"1"}}'
The machine-readable contract is at /v1/tools/schedule-critical-path/versions/1.0.0.
CLI
node cli.mjs run schedule-critical-path 1.0.0 --input input.json --base-url https://computefirst.net
Get the client at /clients/cli/.
Related tools
- Graph shortest unweighted path: Find a shortest directed path by fewest edges from source to target.
- Schedule earliest finish: Compute CPM earliest start and earliest finish times for a DAG with node durations, plus the project makespan.
- Graph validate: Inspect a well-formed directed simple graph and report counts, isolated nodes, and maximum degrees.
- Schedule ready nodes: List DAG nodes that can start because they are not completed and every predecessor is completed.
- Graph ancestors: List every ancestor of given targets, including the targets, in reverse-graph BFS discovery order.
- Graph DAG longest path: Return a longest node-weighted path in a DAG, where path weight is the sum of node durations.