Graph transitive reduction
graph-transitive-reduction · version 1.0.0 · Graphs & scheduling · free, no key needed
Compute the transitive reduction of a DAG: keep an edge u→v iff the original graph has no directed path from u to v of length at least 2.
Use when you need to: graph transitive reduction · DAG transitive reduction · remove redundant DAG edges.
Supported
- graph transitive reduction
- DAG transitive reduction
- remove redundant DAG edges
Not supported
- reduction of cyclic graphs
- undirected transitive reduction
- minimum equivalent graph on cycles
- counting paths
Behavior
- Input is a directed simple graph that must be a DAG; self-loops and other cycles throw invalid_input with a message containing cycle.
- Output nodes is the input node array in declared order.
- A directed edge u→v is kept iff the original graph has no directed path from u to v of length at least 2.
- Kept edges appear in original declared edge order.
- Empty graph {nodes:[], edges:[]} is unchanged.
- Reachability is directed; this is not an undirected reduction.
Input
nodes(array of string, required): max items 2000; each min length 1; each max length 256edges(array of object, required): max items 10000
Output
nodes(array of string, required): max items 2000; each min length 1; each max length 256edges(array of object, required): max items 10000
Limits
- max nodes: 2000
- max edges: 10000
- max node id bytes: 256
Example
Request input:
{
"nodes": [
"build",
"test",
"deploy"
],
"edges": [
{
"from": "build",
"to": "test"
},
{
"from": "test",
"to": "deploy"
},
{
"from": "build",
"to": "deploy"
}
]
}
Response:
{
"result": {
"nodes": [
"build",
"test",
"deploy"
],
"edges": [
{
"from": "build",
"to": "test"
},
{
"from": "test",
"to": "deploy"
}
]
}
}
How to call it
MCP
Connect https://computefirst.net/mcp (setup), then call execute with:
{
"id": "graph-transitive-reduction",
"version": "1.0.0",
"input": {
"nodes": [
"build",
"test",
"deploy"
],
"edges": [
{
"from": "build",
"to": "test"
},
{
"from": "test",
"to": "deploy"
},
{
"from": "build",
"to": "deploy"
}
]
}
}
HTTP (no key)
curl -X POST https://computefirst.net/v1/tools/graph-transitive-reduction/versions/1.0.0/execute \
-H "Content-Type: application/json" \
-d '{"nodes":["build","test","deploy"],"edges":[{"from":"build","to":"test"},{"from":"test","to":"deploy"},{"from":"build","to":"deploy"}]}'
The machine-readable contract is at /v1/tools/graph-transitive-reduction/versions/1.0.0.
CLI
node cli.mjs run graph-transitive-reduction 1.0.0 --input input.json --base-url https://computefirst.net
Get the client at /clients/cli/.
Related tools
- Graph DAG longest path: Return a longest node-weighted path in a DAG, where path weight is the sum of node durations.
- Graph shortest unweighted path: Find a shortest directed path by fewest edges from source to target.
- Graph topological sort: Return a Kahn topological order of a directed acyclic graph, breaking ready-set ties by declared node index.
- Graph transitive closure: List directed reachability pairs of path length at least 1, ordered by declared node index.
- Graph ancestors: List every ancestor of given targets, including the targets, in reverse-graph BFS discovery order.
- Graph connected components: Partition a directed simple graph into undirected connected components, ignoring edge direction.